Skip to content
About
Technical Capabilities
Process Control and Error Proofing
Kitting Work
Dunnage, Part Racks, and Delivery Systems
Platform Design
Overhead Carriage Lift Assist
Below Hook Lifting Device
Careers
Contact Us
Start a Project
About
Technical Capabilities
Process Control and Error Proofing
Kitting Work
Dunnage, Part Racks, and Delivery Systems
Platform Design
Overhead Carriage Lift Assist
Below Hook Lifting Device
Careers
Contact Us
Start a Project
START A PROJECT
Home
»
Bulldog Automation: Rear Quarter
Bulldog Automation: Rear Quarter
Product
Rear Quarter Weld Assembly
Challenge
Coherix 3D inspection integration into sealer systems to ensure dispense beads align with customer specifications.
Comprehensive cycle time analysis to guarantee geo-set & buffer stations met required cycle time.
Despite a delay from the OEM, our dedicated team has successfully adhered to the original project dates committed to the customer
Processes
80 KUKA Robots between LH & RH cell
Resistance Welding
Adhesive Dispense
Projection Nut Welding
Projection Stud Welding
Drawn Arc Stud Welding
Material Handling
Cycle Time
59.58s cycle time
Main line footprint: 18,684 ft